Biosystems Bts 350 User Manual — Verified
Check tubing alignment under the pump cover. Clean the aspiration needle with a fine wire. Out of paper or paper loaded backward.
The analyzer measures absorbance at the specified wavelength and calculates the results.
Check the peristaltic pump tubing for flattening, cracks, or leaks. Replace every 6–12 months.
: Peltier element regulating at 25°C, 30°C, and 37°C.
Storage for up to 150 techniques and 2,000 patient results. Operational Procedures biosystems bts 350 user manual
Halogen lamp (6V, 10W) with an extended lifespan.
Input the (e.g., Glucose, Cholesterol, ALT/AST).
Plug exclusively into a grounded three-prong power socket.
Run a cleaning cycle on the flow cell using dedicated cleaning solutions to prevent carryover. Check tubing alignment under the pump cover
:
If the analyzer needs to be relocated or returned for factory service, it must undergo a full decontamination process.
The instrument uses a peristaltic pump. Ensure the aspiration tube is clean and not kinked before drawing the sample/reagent mixture.
#BioSystems #ClinicalChemistry #BTS350 #LabLife #MedicalScience #PrecisionInPractice The analyzer measures absorbance at the specified wavelength
Place the analyzer on a stable, level, and vibration-free surface.
This reference guide provides general instructions for operating and managing the BioSystems BTS-350 analyzer. Always consult the official, printed manufacturer user manual shipped with your physical unit for exact circuit diagrams, component part numbers, and regulatory compliance updates.
Remove the sample tube immediately when the buzzer alerts you.